• Grouting Pipe
  • Grouting Pipe
  • Grouting Pipe
  • Grouting Pipe
Grouting Pipe
Grouting Pipe
Grouting Pipe
Grouting Pipe

Grouting Pipe

Grouting pipe is a tool used to inject cement slurry or sand slurry liquid into the deep underground layer to consolidate the foundation or strengthen the foundation . It mainly consists of the main part which conveys the slurry, the valve control part, the sealing part and the connection part. The grouting pipe can effectively control the rise of groundwater level by spraying the water liquid out of the injection hole of the injection pipe through the impact force of high-pressure water and stabbing it into the ground.

Classification :

PRODUCT DETAILS

Grouting pipe is a tool used to inject cement slurry or sand slurry liquid into the deep underground layer to consolidate the foundation or strengthen the foundation . It mainly consists of the main part which conveys the slurry, the valve control part, the sealing part and the connection part. The grouting pipe can effectively control the rise of groundwater level by spraying the water liquid out of the injection hole of the injection pipe through the impact force of high-pressure water and stabbing it into the ground.

Product nameGrouting Pipe
Diameter specification48mm,57mm,76mm,89mm,114mm 133mm,159mm,168mm,219mm,273mm,etc.
Length specification1m ,1.5m,2m ,3m ,4m ,5m, 6m ,9m,12m,etc.
MaterialPVC Grouting Pipe ,PE grouting pipe,Galvanized steel pipe,Steel flower pipe grouting pipe
Thickness4mm、4.5mm、5mm、5.5mm、6mm, 8mm,etc.
Size108*4.5、89*4.5、110*5,etc.
Lead time7 to 15 working days after the receipt
PackingWooden palletor according tocustomer's request
ApplicationFoundation reinforcement, basement waterproofing and wall reinforcement, bridges, railroads, urban elevated, highway piling, reservoirs, dams, locks, subway, tunnels, roads, bridges, mines, roadway

Features
Simple construction: The installation of grouting pipe is simple, usually a complete set of equipment, can be intercepted at the construction site according to the size of the joints at will, without the need for special tools or skills.
Remarkable effect : The grouting pipe can seal the construction joints, cold joints, pipe leaks and joints between ground walls by injecting slurry, thus improving the bearing capacity and stability of the foundation, and reducing the problems of settlement and cracking.
Lower cost :Compared with traditional methods such as excavation and backfilling, grouting pipe can avoid a large amount of earth excavation and waste disposal, reduce the damage to the environment, and thus reduce the cost of the project.
Flexibility and adaptability: Grouting pipes can be customized according to different geological conditions and project requirements, which is highly flexible and adaptable.
Good pressure resistance: The grouting pipe can withstand high grouting pressure, usually the grouting pressure can reach more than 2MPa, and the pressure resistance of the grouting pipe can reach more than 3MPa, which ensures the grouting construction to be carried out smoothly.

Areas of application:
Construction Industry :
Foundation reinforcement: by injecting cement slurry or other slurry into the cracks or cavities of soil or rock, it enhances the bearing capacity of the foundation and prevents the foundation from settling and bulging.
Basement waterproofing: Used for waterproofing basements to repair problems such as wall cracks and ceiling leakage.
Wall reinforcement : Enhance the strength and stability of the walls of the building.

Water conservancy engineering :
Leakage prevention and reinforcement: Used for leakage prevention treatment of reservoirs, dams, sluices and other projects, to improve the stability of dams or foundations by injecting cement slurry or other slurries.
Reinforcement of dam foundation: injecting slurry into bedrock or soil layer to improve the bearing capacity of foundation and enhance the stability of dam.

Subway and tunnel construction :
Waterproofing and water stopping : During the construction of subway tunnels, waterproof concrete or chemical slurry is injected into the surrounding rock of the tunnels to prevent groundwater from seeping into the tunnels and to ensure the safety of construction and operation.
Water leakage repair of construction and deformation joints: for water leakage repair of construction and deformation joints in subways and tunnels, as well as grouting channels for burying water stops.

The length can be customizecthe thickness is made accoording to your requirements.

USA Japan Germany U.K.

 

France Italy Spain Switzerland China

AISI/SAE

JIS

W‐nr.

DIN

BS

EN

AFNOR

UNI

UNE

SS

GB

A570.36

STKM 12A

1.0038

RSt.37‐2

4360

‐

E 24‐2

‐

‐

1311

15

-

STKM 12C

-

-

40 C

-

Ne

-

-

-

-

1015

‐

1.0401

C15

080M15

‐

CC12

C15, C16

F.111

1350

15

1020

‐

1.0402

C22

050A20

2C

CC20

C20, C21

F.112

1450

20

1213

SUM22

1.0715

9SMn28

230M07

1A

S250

CF9SMn28

F.2111

1912

Y15

11SMn28

12L13

SUM22L

1.0718

9SMnPb28

‐

‐

S250Pb

CF9SMnPb28

11SMnPb28

1914

‐

‐

‐

1.0722

10SPb20

‐

‐

10PbF2

CF10Pb20

10SPb20

‐

‐

1215

‐

1.0736

9SMn36

240M07

1B

S300

CF9SMn36

12SMn35

‐

Y13

12L14

‐

1.0737

9SMnPb36

‐

‐

S300PB

CF9SMnPb36

12SMnP35

1926

‐

1015

S15C

1.1141

Ck15

080M15

32C

XC12

C16

C15K

1370

15

1025

S25C

1.1158

Ck25

‐

‐

‐

‐

‐

‐

25

A572-60

‐

1.890

StE380

4360 55

‐

‐

FeE390KG

‐

2145

‐

1035

‐

1.0501

C35

060A35

‐

CC35

C35

F.113

1550

35

1045

‐

1.0503

C45

080M46

‐

CC45

C45

F.114

1650

45

1140

‐

1.0726

35S20

212M36

8M

35MF4

‐

F210G

1957

‐

1039

‐

1.1157

40Mn4

150M36

15

35M5

‐

‐

‐

40Mn

1335

SMn438(H)

1.1167

36Mn5

‐

‐

40M5

‐

36Mn5

2120

35Mn2

1330

SCMn1

1.1170

28Mn6

150M28

14A

20M5

C28Mn

‐

‐

30Mn

1035

S35C

1.1183

Cf35

060A35

‐

XC38TS

C36

‐

1572

35Mn

1045

S45C

1.1191

Ck45

080M46

‐

XC42

C45

C45K

1672

Ck45

1050

S50C

1.1213

Cf53

060A52

‐

XC48TS

C53

‐

1674

50

1055

‐

1.0535

C55

070M55

9

‐

C55

‐

1655

55

1060

‐

1.0601

C60

080A62

43D

CC55

C60

‐

‐

60

1055

S55C

1.1203

Ck55

070M55

‐

XC55

C50

C55K

‐

55

1060

S58C

1.1221

Ck60

080A62

43D

XC60

C60

‐

1678

60Mn

1095

‐

1.1274

Ck101

060A96

‐

XC100

‐

F.5117

1870

‐

W1

SK3

1.1545

C105W1

BW1A

‐

Y105

C36KU

F.5118

1880

‐

W210

SUP4

1.1545

C105W1

BW2

‐

Y120

C120KU

F.515

2900

‐

 

Packing and delivery

Since its establishment, the company has adhered to the philosophy of quality as the basis, integrity, operation and integrity, and is committed to providing customers with high-quality steel products and professional services.

 

图片名称

CUSTOMER VISIT

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

CERTIFICATE OF HONOR

COOPERATIVE PARTNER

Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner

FACTORY WORKSHOP

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

FAQ

Once the products received by customer were found not comply with the products or contract demands, what will you do?

Once the products received by customer were found not comply with the products or contract demands, what will you do?

A: We will compensate the customer for all the loss without any hesitation.
A: We will compensate the customer for all the loss without any hesitation.
Do you provide samples Is it free or extra?

Do you provide samples Is it free or extra?

A: Yes, we could offer free samples.
A: Yes, we could offer free samples.
What certifications do your products have?

What certifications do your products have?

A: We have ISO 9001, SGS, EWC and other certifications.
A: We have ISO 9001, SGS, EWC and other certifications.
What kind of payment terms would you accept?

What kind of payment terms would you accept?

A: We always do T/T.30% T/T as deposit,70% T/T as balance.
A: We always do T/T.30% T/T as deposit,70% T/T as balance.
What is the delivery time?

What is the delivery time?

A: 10-15 days
A: 10-15 days
What is your MOQ?

What is your MOQ?

A: We will provide Original Mill Usually 25 tonnes, but it can be adjusted according to your needs and the actual situation of the inventory.
A: We will provide Original Mill Usually 25 tonnes, but it can be adjusted according to your needs and the actual situation of the inventory.

RELATED PRODUCTS


GET A FREE QUOTE

Zhongpu (Shandong) Special Steel Co., Ltd.

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%